{"id":17202,"date":"2024-11-11T02:24:03","date_gmt":"2024-11-11T02:24:03","guid":{"rendered":"https:\/\/ktg.com.vn\/?p=17202"},"modified":"2024-12-02T10:47:41","modified_gmt":"2024-12-02T10:47:41","slug":"don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-mai-nha","status":"publish","type":"post","link":"https:\/\/ktg.com.vn\/en\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-mai-nha\/","title":{"rendered":"Vietnam simplifies rooftop solar installation procedures for public offices and households"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Office of the Government has issued Notification No. 387\/TB-VPCP dated August 16, 2024, announcing Deputy Prime Minister Tran Hong Ha's conclusions on developing and promulgating a Decree on mechanisms and policies to encourage the growth of self-produced, self-consumed rooftop solar power. This marks a significant milestone in advancing renewable energy in Vietnam.<\/span><\/p>\n<h2><b>Political Commitment and Development Direction<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The Prime Minister and Deputy Prime Minister have recently issued strong directives regarding the development of this Decree. The spirit of these directives is clearly reflected in the motto \"focus on implementation, not regression,\" affirming no delays in timing, schedule, or objectives. The Ministry of Industry and Trade has fundamentally incorporated these directives and is finalizing the draft Decree to ensure feasibility and alignment with new circumstances.<\/span><\/p>\n<h2><b>Clarification of Concepts and New Regulations<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A notable aspect of the new policy is the refinement of the \"self-production, self-consumption\" concept in rooftop solar power. The primary purpose of installing rooftop solar systems is to serve on-site consumption needs of residents and businesses. In cases of surplus power generation, the amount permitted for grid sale must not exceed 20% of total capacity, ensuring adherence to the \"self-production, self-consumption\" principle.<\/span><\/p>\n<h2><b>Administrative Procedure Simplification<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">For residents, households, and public sector facilities, the new policy emphasizes administrative procedure simplification. These entities will be subject to post-inspection rather than pre-inspection mechanisms. This means they only need to notify relevant authorities about grid-connected power generation after installing equipment on existing structures.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-17203 size-full\" src=\"https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1.jpg\" alt=\"\u0110\u01a1n gi\u1ea3n h\u00f3a quy tr\u00ecnh \u0111\u1ec3 khuy\u1ebfn kh\u00edch h\u1ed9 gia \u0111\u00ecnh v\u00e0 c\u00f4ng s\u1edf l\u1eafp \u0111\u1eb7t \u0111i\u1ec7n m\u1eb7t tr\u1eddi m\u00e1i nh\u00e0\" width=\"1200\" height=\"800\" srcset=\"https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1.jpg 1200w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-300x200.jpg 300w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-1024x683.jpg 1024w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-768x512.jpg 768w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-18x12.jpg 18w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-24x16.jpg 24w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-36x24.jpg 36w, https:\/\/ktg.com.vn\/wp-content\/uploads\/2024\/11\/don-gian-hoa-thu-tuc-lap-dat-dien-mat-troi-1-48x32.jpg 48w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"font-weight: 400;\">\u0110\u01a1n gi\u1ea3n h\u00f3a quy tr\u00ecnh \u0111\u1ec3 khuy\u1ebfn kh\u00edch h\u1ed9 gia \u0111\u00ecnh v\u00e0 c\u00f4ng s\u1edf l\u1eafp \u0111\u1eb7t \u0111i\u1ec7n m\u1eb7t tr\u1eddi m\u00e1i nh\u00e0<\/span><\/p>\n<h2><b>Capacity-Based Management Classification<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The new policy categorizes management based on installation capacity:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For installations with capacity from 100kW to under 1MW: Mandatory registration with local power authorities for remote control system grid connection when selling surplus power.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For projects 1MW and above: Investors must complete business registration as per legal requirements.<\/span><\/li>\n<\/ul>\n<h2><b>Technical Solutions and Management<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">To ensure power system operational safety, the Deputy Prime Minister requires:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establishment of regulations for metering system acceptance and remote data collection<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Implementation of local monitoring and control systems<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Information connectivity with distribution-level monitoring and control systems<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Research into digital management solutions for rooftop solar power, especially during holidays<\/span><\/li>\n<\/ul>\n<h2><b>Special Policies for Systems with Storage Batteries<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">For rooftop solar systems with storage batteries, the new policy proposes allowing 100% surplus power purchase and time-based pricing. This differentiates it from conventional systems, aiming to encourage investment in energy storage technology.<\/span><\/p>\n<h2><b>Upcoming Tasks<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The Ministry of Industry and Trade, Vietnam Electricity Group, Northern Power Corporation, Energy Institute, and related agencies are tasked with:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Studying and calculating load demands<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Evaluating transmission capabilities<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensuring system control and safety<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Proposing capacity upgrade solutions for rooftop solar<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">These proposals will be submitted to the Prime Minister in September 2024 for consideration in adjusting the National Power Development Plan regarding rooftop solar energy.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The issuance of these new policies demonstrates the government's determination to advance renewable energy while ensuring operational feasibility and safety. The adjustments to administrative procedures and management mechanisms are expected to facilitate public and business participation in the country's green energy transition.<\/span><\/p>\n<p><em>Ngu\u1ed3n: EVN<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>V\u0103n ph\u00f2ng Ch\u00ednh ph\u1ee7 v\u1eeba ban h\u00e0nh Th\u00f4ng b\u00e1o s\u1ed1 387\/TB-VPCP ng\u00e0y 16\/8\/2024, c\u00f4ng b\u1ed1 k\u1ebft lu\u1eadn c\u1ee7a Ph\u00f3 Th\u1ee7 t\u01b0\u1edbng Tr\u1ea7n H\u1ed3ng H\u00e0 v\u1ec1 vi\u1ec7c x\u00e2y d\u1ef1ng v\u00e0 ban h\u00e0nh Ngh\u1ecb \u0111\u1ecbnh quy \u0111\u1ecbnh c\u01a1 ch\u1ebf, ch\u00ednh s\u00e1ch khuy\u1ebfn kh\u00edch ph\u00e1t tri\u1ec3n \u0111i\u1ec7n m\u1eb7t tr\u1eddi m\u00e1i nh\u00e0 t\u1ef1 s\u1ea3n, t\u1ef1 ti\u00eau. \u0110\u00e2y \u0111\u01b0\u1ee3c xem [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":17204,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[],"class_list":["post-17202","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"acf":[],"_links":{"self":[{"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/posts\/17202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/comments?post=17202"}],"version-history":[{"count":3,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/posts\/17202\/revisions"}],"predecessor-version":[{"id":17230,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/posts\/17202\/revisions\/17230"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/media\/17204"}],"wp:attachment":[{"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/media?parent=17202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/categories?post=17202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ktg.com.vn\/en\/wp-json\/wp\/v2\/tags?post=17202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}